|
|
General Contractor
OVM Prestress Co. (Pte) Ltd
Client
Land Transport Authority of Singapore
Scope of Work
Design, Supply, Fabrication, Testing and
Installation and Actual operation of moving the
existing flyover on the steel structure support with
roller by means of hydraulic jack pulling.
The moving of flyover was carried out after
mid-night and finished in the early morning.
|
|